Image Source: insideevs.com

Key Takeaways:

  • Voltpost has launched its innovative lamppost EV chargers in New York’s Westchester County, starting with the Village of Larchmont.
  • The pole-mounted charging system leverages existing public infrastructure, promising faster deployment and reduced costs compared to traditional charging stations.
  • Each lamppost can host two ‘Air’ chargers, delivering up to 9.6 kilowatts for Level 2 charging, ideal for overnight or extended parking sessions.
  • Future expansion is planned for Yonkers, Rye, and eventually to Connecticut and California, supported by strategic partnerships.
  • The initiative aims to democratize access to clean transportation, addressing a critical need for convenient urban EV charging solutions.

Revolutionising Urban Mobility: Voltpost’s Lamppost EV Chargers Go Live in New York

In a significant stride towards accelerating electric vehicle (EV) adoption in urban environments, Voltpost, an American startup at the forefront of innovative charging solutions, has officially launched its pioneering lamppost EV chargers in New York State. The initial deployment has commenced in the Village of Larchmont, nestled within Westchester County, marking a pivotal moment for accessible and sustainable urban charging infrastructure.

This initiative transforms existing public lampposts into vital EV charging hubs, addressing a long-standing challenge for electric vehicle owners, particularly those residing in densely populated areas without private garages or dedicated charging facilities. The company has confirmed plans for further expansion, with new installations slated for Yonkers and Rye in the near future.

Leveraging Existing Infrastructure for Enhanced Accessibility

Voltpost’s core innovation lies in its ability to repurpose ubiquitous urban infrastructure – public lampposts – for EV charging. This strategic approach drastically reduces the traditional barriers associated with establishing new charging stations, such as extensive civil works, substantial land acquisition, and complex grid integration.

The company asserts that its pole-mounted dispensers can be installed within a matter of hours, a stark contrast to the days or even weeks required for conventional charging infrastructure. Furthermore, the cost and physical footprint are a fraction of what traditional installations demand, making it an economically viable and space-efficient solution for municipalities grappling with limited space and budget constraints.

Technical Specifications and User Convenience

The Voltpost system is engineered for efficiency and user-friendliness. Each lamppost is capable of accommodating two of the company’s ‘Air’ chargers, with each unit designed to deliver up to 9.6 kilowatts of power. This output is ideal for Level 2 charging, a standard commonly employed for residential and public charging scenarios where vehicles are parked for extended durations, such as overnight or during work hours.

To ensure durability and safeguard against environmental elements and potential vandalism, the lamppost EV chargers are strategically installed approximately 10 feet (3 meters) above ground level. They feature retractable cables equipped with J1772 connectors, a universal standard for Level 2 AC charging in North America, ensuring compatibility with a broad range of electric vehicles.

Voltpost estimates that its pole-mounted dispensers typically require between six and ten hours to fully charge an EV’s battery. This makes the solution particularly well-suited for situations where vehicles remain stationary for prolonged periods, aligning with the daily routines of urban commuters and residents who park their cars for significant portions of the day.

Deployment Details and Digital Integration

The inaugural suspended chargers in Larchmont are strategically positioned in a parking lot at 61 Wendt Avenue. This location offers optimal convenience for local residents and commuters, being in close proximity to the village’s train station and bustling commercial area, where vehicles are frequently parked for extended durations.

Enhancing the user experience, these lamppost EV chargers are fully internet-connected, leveraging AT&T’s robust network for real-time data exchange. EV drivers can seamlessly access the charging network through the dedicated Voltpost application. This intuitive app allows users to effortlessly locate available charging stalls, check their current availability, and monitor their charging sessions remotely, providing unparalleled convenience and control.

Strategic Partnerships Fueling Expansion

Jeff Prosserman, CEO and Co-Founder of Voltpost, underscored the company’s commitment to expanding clean transportation access. He stated, “We are proud to partner with Larchmont on the first Voltpost Westchester deployment to empower residents with access to clean transportation. By turning infrastructure that already exists into a charging network, we can bring reliable, convenient charging into communities where people live and park today, faster and at lower cost for municipalities.” This statement highlights the core philosophy driving Voltpost’s deployment strategy.

The Larchmont project specifically benefits from the support of the New York State Energy Research and Development Authority’s (NYSERDA) Vehicle to Grid program. Such partnerships with state-level energy authorities are crucial for funding and endorsing innovative sustainable energy solutions.

Beyond its initial successes in Westchester County, Voltpost is aggressively pursuing a broader expansion strategy. The company recently forged a significant partnership with InCharge Energy, a national provider specializing in EV charging installation and maintenance services. This collaboration is designed to significantly accelerate the deployment of lamppost EV chargers across the United States.

Initially, the strategic alliance between Voltpost and InCharge Energy will concentrate its efforts on key markets within the Northeast and West Coast. This focused approach includes New York, alongside plans for rapid expansion into Connecticut and California, states with burgeoning EV populations and a strong commitment to green initiatives.

Addressing the Urban Charging Challenge

The proliferation of electric vehicles has brought forth a pressing need for scalable and accessible charging infrastructure, particularly in urban centres where space is at a premium and off-street parking is scarce. Traditional charging stations often require significant dedicated space and substantial electrical upgrades, posing logistical and financial hurdles for municipalities.

Voltpost’s approach with lamppost EV chargers offers a compelling solution by integrating charging capabilities into the existing urban fabric. This not only mitigates installation complexities but also helps to de-centralize the charging network, making it more robust and convenient for a wider segment of the EV-driving population.

As cities worldwide strive to meet ambitious decarbonisation targets and promote sustainable transport, solutions like Voltpost’s become indispensable. They represent a practical and forward-thinking pathway to building comprehensive, reliable, and equitable charging networks that can keep pace with the accelerating demand for electric vehicles.

Frequently Asked Questions (FAQ)

What are Voltpost lamppost EV chargers?

Voltpost lamppost EV chargers are innovative electric vehicle charging units that integrate directly into existing public streetlights. This system leverages urban infrastructure already in place, offering a more cost-effective and space-efficient solution for expanding EV charging networks, particularly in densely populated areas.

Where are Voltpost chargers currently available in New York?

Voltpost has launched its first lamppost EV chargers in New York in the Village of Larchmont, located in Westchester County. The company has also announced immediate plans to expand its network to other localities within Westchester, specifically the City of Yonkers and the City and Town of Rye.

What type of charging do these lamppost units provide?

The Voltpost lamppost chargers provide Level 2 (AC) charging. Each unit can deliver up to 9.6 kilowatts of power. This charging speed is well-suited for situations where an electric vehicle will be parked for several hours, such as overnight or during a workday, allowing for a full battery charge over 6-10 hours.

How is the Voltpost charging system managed and accessed?

The charging system is digitally integrated, connecting to the internet via AT&T’s network. Users can manage and access the lamppost EV chargers through the dedicated Voltpost mobile application. This app allows drivers to locate available charging points, check their real-time status, and monitor their charging sessions from their smartphones.

What are the key benefits of using existing lampposts for EV charging?

Utilizing existing lampposts for EV charging significantly reduces installation time, cost, and the physical footprint compared to building new, standalone charging stations. It streamlines the deployment process, minimises urban disruption, and helps to rapidly expand public charging accessibility by integrating seamlessly into the existing urban landscape.

Are there plans for Voltpost to expand beyond New York?

Yes, Voltpost has ambitious expansion plans. The company has partnered with InCharge Energy to accelerate deployments nationwide. Initially, this partnership will focus on expanding the lamppost EV chargers into Connecticut and California, two states with growing demand for electric vehicle infrastructure and a commitment to sustainable transport solutions.

Created with ❤